so how did we get from the sketch above ..

to the piece we installed last tuesday ? well, ill tell you, it didnt happen overnight. click the photos to enlarge them ..

we started with this photo that was actually taken, i am surprised to note, on the 5th of february, 2013.

from that photo i made the collage above in photoshop, and though i cant find them now, i sketched four different concepts, from which i made the four slightly different cad drawings below.

and the winner is ...

this one .. that was all fine and good to go and we had a deposit and we ordered the wood, and then ... another more time sensitive opportunity presented itself to us


so on we went, adding details to the verticals of the face frames, an edge inlay on the main counter, borders on the drawer faces, custom cast drawer pulls, and paneled case ends. that all took a minute.


ready for finish below

until we finally arrived at last monday, the photo below, and the day before the installation when all the finished parts had to be finally glued and applied to the cases, final assembled and then
disassembled yet again, and loaded into the van and the truck and carried up a flight of steps
to be installed at the clients home.


we had done a preinstallation level check and the room was remarkably level plumb square and true and we were able to move through the installation and clean up in a remarkably short amount of time. all in, all done ... great project ... incredibly patient clients ... glad to have our shop back ...